Construction and rehabilitation costs for buried pipe with a focus on trenchless technologies
Construction and rehabilitation costs for buried pipe with a focus on trenchless technologies
Download | |
---|---|
DOI | Resolve DOI: https://doi.org/10.4224/20378589 |
Author | Search for: ; Search for: 1 |
Affiliation |
|
Format | Text, Technical Report |
Physical description | 36 p. |
Subject | Rehabilitation techniques; Pipes and pipelines; cost; rehabilitation; buried pipe; access hold; trenchless methods; case studies |
Abstract | |
Publication date | 2002-06-01 |
Publisher | National Research Council of Canada |
Series | |
Language | English |
Peer reviewed | No |
NRC number | NRC-IRC-14887 |
NPARC number | 20378589 |
Export citation | Export as RIS |
Report a correction | Report a correction (opens in a new tab) |
Record identifier | 3b26ac27-7fd3-430c-8ad3-2559d2b9f243 |
Record created | 2012-07-24 |
Record modified | 2022-10-27 |
- Date modified: